Skip to content
Safar Time

Karachi · Bus rapid transit

Green Line BRT

Run by Built by federal govt (SIDCL); operational control transferred to Government of Sindh / Sindh Mass Transit Authority from 10 Mar 2025 (news). 20.9 km.
Checked 4 Nov 2026Official website

Key facts

Hours
Full operation 6:00 AM – 10:00 PM (as announced at launch, Dec 2021); no current official timetable found News report, not confirmed by the operator source
Fare
Distance-based, maximum Rs 55 per person (Dawn, Mar 2025; Sindh set aside Rs1bn subsidy to hold fares). Since 31 Dec 2025 Green and Orange lines linked: Orangi–Numaish possible on a single ticket. News report, not confirmed by the operator source
How to pay
Not published on the sources we could read.

Stations

The operator does not publish a station list on the pages we could read, so we don’t show one.

Notes

Surjani Town to Numaish (via North Nazimabad) per Dawn Dec 2025; launch reports said 25 stations incl. extension to Municipal Park. No official station list found; SIDCL site unreachable; SMTA site has only a description. 20.9 km is Dawn's figure for the dedicated corridor (ARY 2021 said 22 km).

Questions

What are the Green Line BRT timings?

Full operation 6:00 AM – 10:00 PM (as announced at launch, Dec 2021); no current official timetable found (from a news report; not confirmed by the operator).

What is the Green Line BRT fare?

Distance-based, maximum Rs 55 per person (Dawn, Mar 2025; Sindh set aside Rs1bn subsidy to hold fares). Since 31 Dec 2025 Green and Orange lines linked: Orangi–Numaish possible on a single ticket. (from a news report; not confirmed by the operator).

More in Karachi and beyond